Consultancy and construction services on micro-hydropower plant.

Project title 12

Consultancy and construction services on micro-hydropower plant.

Target area

Mokhun village, Kuhistoni Mastchoh, Tajikistan

Goal

Provison of secondary school and medical center of Arnokhun village with 20 KW of electricity through of MHPP.

Specific objectives

·  Providing ideas for the hydroelectric power plant design and layout;

·  Development of a hydroelectric power plant design and estimate;

·  Consulting during the construction process.

Results

·  Technical report on findings and recommendations was developed and submitted to the donor;

·  The “Project and drawings of the hydroelectric power station”, as well as the “Cost estimate” were developed and presented in electronic and printed form to the donor;

·  Technical advice was provided during all construction works

Duration

February 2018 – March 2018

 

 

Donor

EU// ACTED

 